Above are some photos from Friday April 24, our site prep day: scraping, leveling, and an initial stake-out of footing locations took place. Also, Knife River concrete in Eugene made 8 cool appearances on the site to give us  a large pile of gravel to be used in our floodplain fill. A big thank you to Knife River for their generosity and support of this project.

After the site was leveled, a few of us (with much hemming and head-scratching) staked out the footing locations, making sure they were as square as possible. We then set the footings out where they are to be placed. The next step: digging, placing our eight deep “dead-man” footings, filling with gravel, then placing our top footings. This should get us out of the ground in one weekend — can we do it? Yes, we can!

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s